VV2-2161
Veeva Vault Maintenance Notification
Veeva Vault Maintenance Notification
Veeva Maintenance Release Notification
Online maintenance will be performed on General Release PODs. There is no expected downtime, however, a short service interruption may be experienced.
When: Tuesday, September 15 at 10:00 am PDT / 7:00 pm CEST
What: POD Infrastructure maintenance
Estimated Duration: 180 minutes
Affected PODs: General Release PODs
VV1-1061, VV1-1067, VV1-1082, VV1-1110, VV1-1150, VV1-1169, VV1-1173, VV1-1176, VV1-1188, VV2-2063, VV2-2097, VV2-2121, VV2-2144, VV2-2158, VV2-2159, VV2-2160, VV2-2161, VV2-2162
For updates regarding system availability, please refer to the Veeva Trust Site .
If you have any further questions, please submit a ticket with Veeva Product Support .
Reference: DEV-1007757
Veeva Maintenance Notification
Veeva Vault is scheduled to roll over the signing certificate used to sign SAML Single Sign-on requests and Spark Messaging connections. There is no expected downtime however user logins may be affected if proper action is not taken.
IMPORTANT
- At the end of the testing period on July 31, 2026, at 6:00 pm PT, all SAML Profiles of all Vault Domains are automatically switched to the new SAML certificate.
- If there is an issue, the old certificate can be reinstated until September 4, 2026, at 6:00 pm PT, when we will automatically switch all profiles to the new certificate (with no possible rollback to the old certificate).
Additional details and guidance can be found in Vault Help.
Changes to dates or times will be posted to Trust.
If you have further questions, please submit a ticket with Veeva Product Support.
Veeva Vault Maintenance Notification
Veeva Vault Maintenance Release Notification
Veeva Safety Maintenance Release Notification
What: Veeva Safety 26R2.0.5
Affected PODs: US/EU PODs
Scheduled Maintenance closed.
Veeva Vault Maintenance Notification
Veeva Release NotificationWhat: Veeva 26R2 General Release When: Friday, August 7 Estimated Vault Downtime: 10 minutes
|
Affected PODs and Time of Deployment |
Veeva Safety between 1:00 pm and 3:00 pm PDT/10:00 pm and midnight CEST (August 8, between 5:00 and 7:00 am JST): VV2-2156, VV2-2162, VV3-3120, VV3-3131 VV1-1067, VV1-1142, VV1-1150, VV1-1169, VV1-1176, VV1-1181, VV2-2063, VV2-2158, VV2-2159, VV2-2160, VV2-2161 |
VV1-1061, VV1-1202, VV2-2121, VV2-2153 |
Veeva LIMS between 7:00 pm and 9:00 pm PDT : VV1-1173, VV1-1211, VV1-1221 |
Click here to learn how to find your Vault's POD location. |
26R2 Release Information
|
Scheduled Maintenance closed.