CDMS-AP
Veeva Maintenance Notification
Veeva Vault is scheduled to roll over the signing certificate used to sign SAML Single Sign-on requests and Spark Messaging connections. There is no expected downtime however user logins may be affected if proper action is not taken.
IMPORTANT
- At the end of the testing period on July 31, 2026, at 6:00 pm PT, all SAML Profiles of all Vault Domains are automatically switched to the new SAML certificate.
- If there is an issue, the old certificate can be reinstated until September 4, 2026, at 6:00 pm PT, when we will automatically switch all profiles to the new certificate (with no possible rollback to the old certificate).
Additional details and guidance can be found in Vault Help.
Changes to dates or times will be posted to Trust.
If you have further questions, please submit a ticket with Veeva Product Support.
There is a 26R2.0.13 maintenance release scheduled for the DQS-Data Quality System on August 19th at 7:00 PM PT for DQS PODs:
CDB-1, CDB-3, CDB-5, CDB-7, CDB-9, CDB-11, CDB-13, CDB-15, CDB-17, CDB-101, CDB-103, CDB-105, CDB-107, CDB-201, CDB-203, CDB-301, CDB-303, CDB-305, CDB-307, CDB-309, CDB-311, CDB-313, CDB-315, CDB-1004, CDB-2002, CDB-3002
Approximate duration is 1 hr with no expected downtime. Scheduled jobs running during this window will need to be rerun.
Please read the 26R2 Release Notes for additional release details.
Veeva EDC 26R2.0.13 HF is scheduled for production release on 08/19/2026 to EDC P ODs:
VV1-22, VV1-1090, VV2-2092, VV1-1127, VV1-1139, VV1-1148, VV1-1159, VV1-1161, VV1-1174, VV1-1175, VV1-1193, VV1-1194, VV1-1204, VV3-3121, VV3-3136, VV2-2142, VV1-1222, VV1-1223, VV1-1225, VV2- 2163, VV2- 2164, VV2- 2165, VV1-1215, VV1-1216, VV1-1217, VV1-37, VV2-2152, VV3-3136
The EDC Utility services will not be available from 6:00 PM to 8:30 PM PST.
Please read the 26R2 Release Notes for additional release details.
There is a 26R2.0.11 maintenance release scheduled for the DQS-Data Quality System on August 14th at 7:30 PM PT for DQS PODs:
CDB-1, CDB-3, CDB-5, CDB-7, CDB-9, CDB-11, CDB-13, CDB-15, CDB-17, CDB-101, CDB-103, CDB-105, CDB-107, CDB-201, CDB-203, CDB-301, CDB-303, CDB-305, CDB-307, CDB-309, CDB-311, CDB-313, CDB-315, CDB-1002, CDB-1004, CDB-2002, CDB-2004, CDB-3002
Approximate duration is 1 hr with no expected downtime. Scheduled jobs running during this window will need to be rerun.
Please read the 26R2 Release Notes for additional release details.
Veeva EDC 26R2.0.11 HF is scheduled for production release on 08/14/2026 to EDC P ODs:
VV1-22, VV1-1090, VV2-2092, VV1-1127, VV1-1139, VV1-1148, VV1-1159, VV1-1161, VV1-1174, VV1-1175, VV1-1193, VV1-1194, VV1-1204, VV3-3121, VV3-3136, VV2-2142, VV1-1222, VV1-1223, VV1-1225, VV2- 2163, VV2- 2164, VV2- 2165, VV1-1215, VV1-1216, VV1-1217, VV1-17, VV2-2155, VV1-37, VV2-2152, VV3-3136
The EDC Utility services will not be available from 6:30 PM to 9:00 PM PST.
Please read the 26R2 Release Notes for additional release details.
Scheduled Maintenance closed.
Veeva EDC 26R2.0.9 HF is scheduled for production release on 08/12/2026 to EDC P ODs:
VV1-22, VV1-1090, VV2-2092, VV1-1127, VV1-1139, VV1-1148, VV1-1159, VV1-1161, VV1-1174, VV1-1175, VV1-1193, VV1-1194, VV1-1204, VV3-3121, VV3-3136, VV2-2142, VV1-1222, VV1-1223, VV1-1225, VV2- 2163, VV2- 2164, VV2- 2165, VV1-1215, VV1-1216, VV1-1217, VV1-17, VV2-2155, VV1-37, VV2-2152, VV3-3136
The EDC Utility services will not be available from 6:00 PM to 8:30 PM PST.
Please read the 26R2 Release Notes for additional release details.
Scheduled Maintenance closed.