VV1-22
Veeva Vault Maintenance Release Notification
Veeva Vault Maintenance Release Notification
Veeva Vault is scheduled to roll over the signing certificate used to sign SAML Single Sign-on requests and Spark Messaging connections. There is no expected downtime however user logins may be affected if proper action is not taken.
On December 12, 2025, we will automatically switch all profiles to the new certificate (with no possible rollback to the old certificate).
See the original Trust post for more detailed information.
On December 12, 2025, we will automatically switch all profiles to the new certificate (with no possible rollback to the old certificate).
Veeva EDC 25R3.0.7 HF is scheduled for production release on 12/11/2025 to EDC PODs:
VV1-22, VV1-1090, VV1-1204, VV2-2092, VV1-1127, VV1-1139, VV1-1148, VV1-1159, VV1-1161, VV1-1174, VV1-1175, VV1-1193, VV1-1194, VV3-3121, VV2-2142, VV1-17, VV2-2155, VV1-37, VV2-2152, VV3-3134
The EDC Utility services will not be available from 6:00 PM to 8:30 PM PST.
Please read the 25R3 Release Notes for additional release details.
Scheduled Maintenance closed.
Veeva Vault Maintenance Release Notification
Veeva EDC 25R3.0.5 HF is scheduled for production release on 12/06/2025 to EDC PODs:
VV1-22, VV1-1090, VV1-1204, VV2-2092, VV1-1127, VV1-1139, VV1-1148, VV1-1159, VV1-1161, VV1-1174, VV1-1175, VV1-1193, VV1-1194, VV3-3121, VV2-2142
The EDC Utility services will not be available from 5:00 PM to 7:30 PM PST.
Please read the 25R3 Release Notes for additional release details.
Scheduled Maintenance closed.
The Veeva EDC service is scheduled to be upgraded. Veeva EDC service will not be available during this time.
What: Veeva EDC 25R3.0 General Release
When: Friday, December 05 at 6:00 PM PT
Estimated Duration: 4 hours
Affected PODs: VV1-22, VV1-1127, VV1-1161, VV1-1194, VV2-2092, VV3-3121
For more details, please read the Release Notes to learn more about the new features.
Scheduled Maintenance closed.
EDC 25R3.0 Release is scheduled for production release on 12/05/2025 to EDC PODs:
VV1-22, VV1-1090, VV2-2092, VV1-1127, VV1-1139, VV1-1148, VV1-1159, VV1-1161, VV1-1174, VV1-1175, VV1-1193, VV1-1194, VV2-2142, VV3-3121, VV1-1204
The EDC Utility services will not be available from 5:00 PM-11:00 PM PST.
Scheduled Maintenance closed.
Veeva Vault POD VV1-22 is currently experiencing a service disruption. Veeva engineering teams are working to return the service to normal as quickly as possible.
Affected Veeva Vault PODs are now fully available with all services operating normally.