MC-20
Veeva CRM Production and Sandbox orgs will be upgraded to the 25R1.2 Minor Release. Systems are generally available during this time.
Scheduled Maintenance closed.
Veeva CRM Sandbox orgs will be upgraded to the 25R1.2 Minor Release. Systems are generally available during this time.
Scheduled Maintenance closed.
The 25R1.3 release date has been updated for the following products: Veeva CRM, Veeva Align, Vault CRM, Vault Align, and Nitro.
-
Veeva CRM, Veeva Align, Vault CRM, and Vault Align:
-
Sandbox release: June 26, 2025
-
Production release: July 2, 2025
-
-
Nitro:
-
Release date: June 26, 2025
-
Veeva CRM Sandbox and Production orgs will be upgraded to the 251.0.300 release for iOS platforms. CRM systems are generally available during this time, but Compass Data Engine may be unavailable.
View Patch Notes
Scheduled Maintenance closed.
Veeva CRM Production and Sandbox orgs will be upgraded to the 25R1.0 Major Release. Systems are generally available during this time.
Scheduled Maintenance closed.
Veeva CRM will be undergoing server maintenance. During this time, MyInsights Studio will be temporarily unavailable for up to 45 minutes. There also may be a delay in Multichannel activities.
Online and offline activities will be available.
Scheduled Maintenance closed.
Veeva CRM Sandbox orgs will be upgraded to the 25R1.0 Major Release. During this time, Multichannel activities may be temporarily unavailable for up to 30 minutes.
Scheduled Maintenance closed.
Veeva CRM will be undergoing server maintenance. During this time, Multichannel and Engage activities will be temporarily unavailable.
Scheduled Maintenance closed.
Veeva CRM Production and Sandbox orgs will be upgraded to the 24R3.5 Minor Release. Systems are generally available during this time.
Scheduled Maintenance closed.
Veeva CRM Sandbox orgs will be upgraded to the 24R3.5 Minor Release. Systems are generally available during this time.
Scheduled Maintenance closed.