CRM-10
Veeva CRM Sandbox and Production orgs are being upgraded to the 261.3.202 release for Online Platforms. During this time, QR Sign-in functionality will be unavailable for up to 30 minutes.
Scheduled Maintenance closed.
Update: Hotfix will be released on June 30 instead of June 29.
Veeva CRM Sandbox and Production orgs are being upgraded to the 261.3.201 release for
Online and iOS Platforms
. Systems are generally available during this time.
View Patch Notes
Scheduled Maintenance closed.
Veeva CRM team has noticed that some scheduled jobs, such as MCCP, are failing to run. Engineering is investigating the issue.
Engineering has applied a solution. We're continuing to monitor the jobs.
Incident has been resolved
Veeva CRM Production orgs will be upgraded to the 26R1.3 Minor Release. Systems are generally available during this time.
View Release Notes
Scheduled maintenance closed.
Veeva CRM Sandbox orgs are being upgraded to the 261.3.101 release for Online Platforms. Systems are generally available during this time.
View Patch Notes
Scheduled Maintenance closed.
Veeva CRM team has noticed that Microsoft Integrations are being impaired. Engineering is investigating the issue.
Incident has been resolved
Veeva CRM Sandbox orgs will be upgraded to the 26R1.3 Minor Release. Systems are generally available during this time.
View Release Notes
Scheduled maintenance closed.
Veeva CRM Sandbox and Production orgs are being upgraded to the 261.2.201 release for Windows Platforms. Systems are generally available during this time.
View Patch Notes
Scheduled Maintenance closed.
Veeva CRM Sandbox and Production orgs will be undergoing system maintenance. During this time, there may be brief service interruptions to Microsoft Integrated features.
Scheduled Maintenance closed.
Veeva CRM Production orgs will be upgraded to the 26R1.2 Minor Release. Systems are generally available during this time.
View Release Notes
Scheduled maintenance closed.