eCOA Vault 26R3.0 Pre-Release Upgrade Notification – Downtime Required
Maintenance
upcoming
2 hours
November 18 2026,11:00am PST
eCOA Vault 26R3.0 Pre-Release Upgrade Notification – Downtime Required
Status: upcoming
Start:
November 18 2026,11:00am PST
Estimated Duration: 120 minutes
Affected Components:
eCOA Vault
eCOA Vault-US
eCOA Vault-EU
eCOA Vault-AP
VV2-2144
VV3-3130
VV1-1182
VV1-1188
Update
November 18 2026,11:00am PST
November 18 2026,11:00am PST
eCOA Vault Release Notification
What: eCOA Vault 26R3.0 Pre-Release Upgrade
When: Wednesday, November 18, 2026, at 11:00 am PT (8:00 pm CET / Thursday, November 19, 2026, at 4:00 am JST)
Estimated Duration: 1 to 2 hours
Affected POD: Pre-Release POD (VV1-1182)
The upgrade is expected to take approximately 10 minutes, during which time your pre-release eCOA Vault will be unavailable for use. Users can continue to work as normal and will be notified in eCOA just before the expected downtime.
The 26R3 Vault self-serve pre-release functionality was enabled for all production eCOA Vaults (PODs VV1-1188, VV2-2144, VV3-3130) on Monday, November 2, 2026. If you don't have a production Vault, pre-release capability was enabled on your sandbox Vault (POD VV1-1182).
The 26R3 Pre-Release Program will conclude on Monday, January 11, 2027.
What's New:
- See About the Release for release details and the impact assessment.
- Read What's New for in-depth information about the new features.
- The Releases tab on Veeva Connect will have additional resources about key features in this release. Join the eCOA community to stay informed.
Support:
- See Pre-Release FAQ for information about the pre-release program.
- See Vault POD Details to learn how to find your Vault's POD location.
- See the Veeva Trust Site for updates regarding system availability. eCOA Vault availability is reported under eCOA Vault, and MyVeeva availability under MyVeeva (eCOA, eConsent).
© 2026 Veeva Trust Site