Veeva 26R1.3 Limited Release Notification - Downtime Required
Veeva 26R1.3 Limited Release Notification - Downtime Required
June 12 2026,10:00am PDT
June 12 2026,10:00am PDT
Veeva Release NotificationWhat: Veeva 26R1.3 Limited Release When: June 12, 2026 Estimated Vault Downtime: 10 minutes
|
Affected PODs and Time of Deployment |
Veeva Vault APAC 10:00 am PDT (Saturday, June 13 at 2:00 am JST): VV3-33 Veeva Vault EU 2:00 pm PDT (11:00 pm CEST): VV2-28, VV2-2087 Veeva Vault US 5:00 pm PDT: VV1-1, VV1-3, VV1-5, VV1-6, VV1-20, VV1-21, VV1-23, VV1-1084, VV1-1120, VV1-1133, VV1-1135, VV1-1178, VV1-1203, VV1-1220 |
Veeva Safety US/EU/APAC 1:00 pm PDT (10:00 pm CEST/Saturday, June 13 at 5:00 am JST): VV1-1053, VV2-2132, VV3-3123 |
Veeva RegulatoryOne US/EU 6:00 pm PDT (Saturday, June 13 at 3:00 am CEST): VV1-1078, VV2-2133 |
Veeva LIMS US 7:00 pm PDT: VV1-1184 |
Visit the Release Notes page to learn more about the new features. If you have a Vault integration or custom code, see the Developer Release Notes. |
June 12 2026,4:24pm PDT
June 12 2026,4:24pm PDT
Update: Some EU Vaults are experiencing a delayed upgrade. The revised estimated completion times for the impacted PODs are listed below:
- VV2-28 - 5:00 pm PDT
- VV2-2087 - 8:00 pm PDT
To check if your specific Vault has already been upgraded to 26R1.3, please refer to the Vault Help article: How to Access Vault Information.
Reference: DEV-1121980
June 12 2026,5:57pm PDT
June 12 2026,5:57pm PDT
VV2-28 and VV2-2087 are now complete. The remaining PODs are on schedule. No additional delays are expected.
June 12 2026,11:00pm PDT
June 12 2026,11:00pm PDT
Scheduled Maintenance closed.